Locate the whole bore path
Mark every utility along and across the planned bore path, not just at the entry and exit pits: public lines through 811 and private lines with EM locating and GPR.
Verify the crossings
Where the bore crosses a critical line, exposing it by potholing confirms its exact depth, so the bore profile can clear it with margin.
Map it
Capturing the located lines with GPS gives the driller and engineer a shared map and leaves a record for the next crew.
Questions
Is GPR useful before boring?
Yes, especially for PVC, HDPE and other non-metallic lines that EM equipment can't trace.
Do you work with telecom and fiber contractors?
Yes. Fiber builds are some of the most common boring projects that need crossings located first.